Midmakh / Buildings
Prototype · mock data Check a wall
Portfolio
MAN-02 · Al-Manjam

Al-Manjam village — tower

Tower · 3 storeys · 190 m² N elevation built c. 1780estimated criticality 4/5

Latest capture

26 Aug 2026 · 70 d ago
Measured on this visit
1.5 mm
max crack width
4%
surface loss
7%
salt loading
Stable
marker MK-MAN-02 · confidence 92% · Y. Al-Amri

Risk

0–100
21Stable
stableintervene

Time to 5 mm71 months
Growth rate0.05 mm / month
Intervention estimateSAR 33,500

Findings

5 captures
Salt crystallisation
dominant mechanism on the last visit
Rising damp line at 35% RH
salt crystallisation risk band
N face exposed to prevailing wind
drives the wet–dry cycle above 44 °C

Crack width over time

mm · measured, then forecast
02357THRESHOLD 5 mm2025-032025-082025-122026-042026-08+8 momm

Dots are accepted captures. The dashed tail is a linear projection of the measured rate — it is what moves this structure up the intervention queue, not the current width alone.

Defects on the latest visit

26 Aug 2026
DefectWidthLengthFaceMechanismDrives risk
Defect 11.5 mm899 mmWSalt crystallisationworst
Defect 20.7 mm302 mmSEStructural crack—
Defect 30.6 mm1,286 mmSEStructural crack—

The wall carries 3 separate defects at this visit. The widest one sets the risk band; the others are counted and carried in the record.

Capture ledger

5 accepted
DateCrackLossSaltRHMechanismCaptured byMarkerConfidence
26 Aug 20261.5 mm · +24%7%35%Salt crystallisationY. Al-AmriMK-MAN-0292%
19 Apr 20261.3 mm · +23%6%29%Water ingressY. Al-AmriMK-MAN-0287%
10 Dec 20251.0 mm · +24%9%63%Structural crackField surveyMK-MAN-0291%
03 Aug 20250.8 mm · +23%7%57%Surface lossY. Al-AmriMK-MAN-0294%
26 Mar 20250.7 mm · +23%5%43%Salt crystallisationField surveyMK-MAN-0298%
Field note

Defensive tower on the village edge. Guardian: Y. Al-Amri.

Site reference: Saudi Press Agency — Al Manjam village report.