Midmakh / Buildings
Prototype · mock data Check a wall
Portfolio
QAB-02 · Al-Qabil

Al-Lijam — mosque

Mosque · 1 storeys · 70 m² SE elevation built c. 1800estimated criticality 4/5

Latest capture

30 Jul 2026 · 97 d ago
Measured on this visit
0.9 mm
max crack width
4%
surface loss
7%
salt loading
Stable
marker MK-QAB-02 · confidence 90% · Field survey

Risk

0–100
19Stable
stableintervene

Time to 5 mm—
Growth rate0.03 mm / month
Intervention estimateSAR 23,000

Findings

6 captures
Water ingress
dominant mechanism on the last visit
Rising damp line at 65% RH
salt crystallisation risk band
SE face exposed to prevailing wind
drives the wet–dry cycle above 44 °C

Crack width over time

mm · measured, then forecast
02357THRESHOLD 5 mm2025-042025-072025-102026-012026-042026-07+8 momm

Dots are accepted captures. The dashed tail is a linear projection of the measured rate — it is what moves this structure up the intervention queue, not the current width alone.

Defects on the latest visit

30 Jul 2026
DefectWidthLengthFaceMechanismDrives risk
Defect 10.9 mm493 mmNEWater ingressworst
Defect 20.3 mm605 mmNSurface loss—

The wall carries 2 separate defects at this visit. The widest one sets the risk band; the others are counted and carried in the record.

Capture ledger

6 accepted
DateCrackLossSaltRHMechanismCaptured byMarkerConfidence
30 Jul 20260.9 mm · +14%7%65%Water ingressField surveyMK-QAB-0290%
25 Apr 20260.8 mm · +11%4%72%Salt crystallisationField surveyMK-QAB-0298%
19 Jan 20260.7 mm · +12%5%66%Structural crackA. Al-HadiMK-QAB-0295%
14 Oct 20250.6 mm · +13%6%41%Water ingressA. Al-HadiMK-QAB-0287%
10 Jul 20250.5 mm · +12%6%45%Salt crystallisationField surveyMK-QAB-0286%
05 Apr 20250.4 mm · +13%4%66%Structural crackA. Al-HadiMK-QAB-0295%
Field note

Congregational mosque of the Al-Lijam quarter. Guardian: A. Al-Hadi.

Site reference: Najran Municipality — أبرز معالم نجران.