Midmakh / Buildings
Prototype · mock data Check a wall
Portfolio
HAD-02 · Al-Hadn

Al-Hadn village — mosque

Mosque · 1 storeys · 197 m² W elevation built c. 1800estimated criticality 4/5

Latest capture

17 Oct 2026 · 18 d ago
Measured on this visit
3.0 mm
max crack width
5%
surface loss
13%
salt loading
Watch
marker MK-HAD-02 · confidence 89% · Field survey

Risk

0–100
41Watch
stableintervene

Time to 5 mm11 months
Growth rate0.18 mm / month
Intervention estimateSAR 39,000

Findings

6 captures
Salt crystallisation
dominant mechanism on the last visit
Rising damp line at 73% RH
salt crystallisation risk band
W face exposed to prevailing wind
drives the wet–dry cycle above 44 °C

Crack width over time

mm · measured, then forecast
02357THRESHOLD 5 mm2025-082025-112026-012026-042026-072026-10+8 momm

Dots are accepted captures. The dashed tail is a linear projection of the measured rate — it is what moves this structure up the intervention queue, not the current width alone.

Defects on the latest visit

17 Oct 2026
DefectWidthLengthFaceMechanismDrives risk
Defect 13.0 mm2,305 mmSSalt crystallisationworst

The wall carries 1 separate defect at this visit. The widest one sets the risk band; the others are counted and carried in the record.

Capture ledger

6 accepted
DateCrackLossSaltRHMechanismCaptured byMarkerConfidence
17 Oct 20263.0 mm5%13%73%Salt crystallisationField surveyMK-HAD-0289%
23 Jul 20262.6 mm5%16%71%Salt crystallisationField surveyMK-HAD-0288%
27 Apr 20261.9 mm5%11%51%Surface lossField surveyMK-HAD-0289%
31 Jan 20261.5 mm3%7%70%Surface lossField surveyMK-HAD-0293%
05 Nov 20251.0 mm3%7%46%Surface lossField surveyMK-HAD-0290%
11 Aug 20250.4 mm2%3%31%Water ingressS. Al-MakramiMK-HAD-0295%
Field note

Village mosque at the foot of Jabal Ra‘oum. Guardian: S. Al-Makrami.

Site reference: Najran Municipality — أبرز معالم نجران.